Planning and Designing of the IT Hardware upgrade for primary site


Industry Served:

Manufacturing

Technology / Product:

HP Integrity Servers – 1 nos.

HP Storage – 1 nos.

Windows server 2008

Storage Mirroring

Scope:

2 locations (Data Center), 

End to End Installation of  HPHardware, DR implementation

Business Benefit:

High availability of Infrastructure.

Better utilization of resources.

Project Description

Planning and Designing of the IT Hardware upgrade for primary site.

Sizing of the hardware and software required for setting DR site.

Supplied the complete Hardware and Software for the project.

Upgrade existing RX 2620 Server and EVA 3000 storage as per configuration required.

Implementation of RX 2660 Server and EVA 4400 storage at DR site.

Installed Operating system Windows 2008.

Implementation HP storage Mirroring at both the locations

Integration of Servers, Software and Storage between both the sites

Completed the testing and documentation for the whole project.

 